Production of the 1st Air-Cooled Generator Set of Wula’er Mountain Power Plant under North Company

from:中国华能集团有限公司date:2022-04-10

Production of the 1st Air-Cooled Generator Set of Wula’er Mountain Power Plant under North Company


On June 12, 2006, the first generator set of phase 3 project of Wula’er Mountain Power Plant of North United Power Co., Ltd. under the control of Huaneng completed a 168-hour test run and was transferred to production one month ahead of the scheduled deadline.

Phase 3 of the plant calls for installation of 2 air-cooled generator sets of 300,000KW each and concurrent installation of desulphurization devices. Construction started in July 2004, involving a total investment of 2.93 billion Yuan.

This is a pilot project of air-cooled generator sets of 300,000KW established by NDRC. To address the water shortage in arid region, direct air-cooling condenser is used to double the saving of water compared to similar wet-cooled generator sets. The completion and production of the project will play a positive role in easing the power shortage in west Inner Mongolia and promoting local economic growth.

Contact Us

Tel:+86-25-84152563

Fax:+86-25-52146294

Email:export@hbtianrui.com

Address:Head Office: No.8 Chuangye Avenue, Economic Development Zone, Tianmen City, Hubei Province, China (Zip Code: 431700) Nanjing Office: Building 23, Baijiahu Science and Technology Industrial Park, No.2 Qingshuiting West Road, Jiangning Economic Development Zone, Nanjing City, Jiangsu Province,China (Zip Code:211106)

Thank you for your message. We will contact you as soon as possible!